Two leaders in Dutch sustainable mobility and Vehicle Body Building are joining forces: Hartog-Est, with 200 years of experience in manufacturing bodies and cargo beds, and E-Lions H2, a pioneer in hydrogen-powered light commercial vehicles, are launching a partnership to develop specialized bodies for E-Lions H2’s hydrogen-powered pickup truck, tailored for businesses in the infrastructure and Landscaping Services sectors.
This collaboration is giving rise to a new product: a hydrogen-powered pickup truck with a body specifically designed for infrastructure and Landscaping Services. Think of transporting equipment, tools, or yard waste—all with the benefits of zero emissions and a custom-built Vehicle Body.
For customers, this means:
- Zero-emission driving while maintaining traction, work capacity, and load capacity—typically required for municipal maintenance, landscaping, or infrastructure maintenance.
- Custom-built bodies tailored to the practical needs of infrastructure and landscaping. Built by an expert in vehicle body building.
- A sustainable, circular commercial vehicle solution that doesn’t compromise on operational flexibility.
With this move, Hartog-Est and E-Lions H2 are demonstrating that they are not only responding to the growing demand for sustainable mobility, but are also actively engaging with the front lines and offering customized solutions where needed. For companies in the infrastructure and Landscaping Services sectors, this can be a very attractive alternative to traditional diesel delivery vans, especially with the increase in zero-emission zones.
The first Pick-Ups will be developed in close collaboration with Mostert Traffic and Versluys Verkeerstechniek. These two innovative players in infrastructure technology are both eager to be involved in this initial phase of zero-emission solutions that allow them to maintain the range and payload they need.
Thanks to the SWiM grant, hydrogen technology is a viable investment for any business and a smart solution to the many challenges of sustainability. The new SWiM grant will open in April 2026. It might be worth looking into this in more detail.











